
Short answer: Every lab that tests patient specimens in West Virginia needs the right federal CLIA certificate, processed by West Virginia Bureau for Public Health, Office of Laboratory Services (OLS).
A non-waived lab in West Virginia must name a laboratory director who meets 42 CFR Part 493, Subpart M for the highest complexity it performs: 42 CFR 493.1405 for moderate complexity and 42 CFR 493.1443 for high complexity. A waived lab still names a director on the CMS-116 and follows the manufacturer's instructions.
| Role | When CLIA requires it | Rule |
|---|---|---|
| Laboratory director | Every non-waived lab | 493.1405 (moderate), 493.1443 (high) |
| Technical consultant | Moderate complexity testing | 493.1411, 493.1413 |
| Technical supervisor | High complexity testing, by specialty | 493.1449, 493.1451 |
| Clinical consultant | Moderate and high complexity | 493.1417, 493.1455 |
| General supervisor | High complexity testing | 493.1461, 493.1463 |
| Testing personnel | Anyone performing non-waived tests | 493.1423 (moderate), 493.1489 (high) |
A director may direct no more than five laboratories and must be on site at least once every 6 months, with at least 4 months between the two visits, while staying reachable for consultation (42 CFR 493.1407; 42 CFR 493.1445). CMS revised the CLIA personnel rules effective December 28, 2024; high complexity directors who were qualified and serving in a CLIA-certified lab on that date, and have served continuously since, remain qualified. Remote data review supports the role between visits but does not replace the required visits.
West Virginia licenses clinical laboratory practitioners through the Office of Laboratory Services (64CSR57), the same office that handles CLIA, so staff licensure belongs on the compliance checklist.
Decide whether you need an employed director, a contracted director, or a director plus a technical consultant. Collect transcripts, board certifications, a current CV and evidence of prior director or supervisory experience, and check the five-lab limit before anyone signs. We review the file against Subpart M so it matches what a surveyor or accreditor will ask for.